SUMMARY OF KEY FINANCIAL INFORMATION
31 Dec 2015 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 31 Dec 2015 | 31 Dec 2014 | 31 Dec 2015 | 31 Dec 2014 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 97,338 | 175,477 | 375,257 | 461,459 | 2 | Profit/(loss) before tax | -4,143 | 3,047 | 2,850 | -9,947 | 3 | Profit/(loss) for the period | -5,178 | 3,030 | 1,206 | -10,423 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | -4,798 | 2,272 | 923 | -10,474 | 5 | Basic earnings/(loss) per share (Subunit) | -4.74 | 2.24 | 0.91 | -10.35 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 1.2700 | 1.3200
|
|
|
|
|
|
|
|
|
发表于 15-3-2016 02:33 AM
|
显示全部楼层
本帖最后由 icy97 于 16-3-2016 12:30 AM 编辑
海德获2861万卫生部合约
财经新闻 财经 2016-03-15 12:33
(吉隆坡14日讯)海德(HTPADU,5028,主板科技股)宣布,获得来自大马卫生部的合约,总额为2861万3761.98令吉。
该公司今天发表文告说,海德在这项合约中,为卫生部的临床文档资料,提供病人管理系统的供应、安装、配置、调试、硬体、软体和设备服务。
这项合约为期4年,从今年的3月21日起,至2020年3月20日。
海德指出,这项合约料利好每股盈利,但不会影响派息政策、负债率以及缴足资本。
海德今天平盘,收报62仙,成交量为12万7000股。
该公司今天发表文告说,海德在这项合约中,为卫生部的临床文档资料,提供病人管理系统的供应、安装、配置、调试、硬体、软体和设备服务。
这项合约为期4年,从今年的3月21日起,至2020年3月20日。
海德指出,这项合约料利好每股盈利,但不会影响派息政策、负债率以及缴足资本。【南洋网财经】
Type | Announcement | Subject | OTHERS | Description | ACCEPTANCE OF LETTER OF AWARD FOR THE APPOINTMENT OF HEITECH PADU BERHAD BY KEMENTERIAN KESIHATAN MALAYSIA (HEALTH MINISTRY) FOR THE SUPPLY, DELIVERY, INSTALLATION, CONFIGURATION, TESTING, COMMISSIONING, HARDWARE, SOFTWARE, AND EQUIPMENT AS WELL AS DEVELOP AND IMPLEMENT A PILOT MODULE FOR CLINICAL DOCUMENTATION (CD) IN PATIENT MANAGEMENT SYSTEM (SISTEM PENGURUSAN PESAKIT (SPP)) | 1. Introduction
HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that the Company has on 14 March 2016 accepted a Letter of Award for the Appointment of HeiTech Padu Berhad by Kementerian Kesihatan Malaysia (Health Ministry) for The Supply, Delivery, Installation, Configuration, Testing, Commissioning, Hardware, Software, and Equipment as well as Develop and Implement a Pilot Module for Clinical Documentation (CD) in Patient Management System (Sistem Pengurusan Pesakit (SPP))
2. The Contract Value
The Contract Value of the project is RM28,613,761.98 (Ringgit Malaysia Twenty Eight Million Six Hundred Thirteen Seven Hundred Sixty One and Cent Ninty Eight Only) (Inclusive 6% GST and 0.4% ePerolehan Service Charge).
3. Duration of the Project
The Contract is for a period of four (4) years commencing from 21st March 2016 to 20th March 2020. Any further renewal or extension of the duration is at the discretion from the Government.
4. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
5. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
6. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
7. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
8. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividened policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 14 March 2016. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/5030049
|
|
|
|
|
|
|
|
发表于 12-4-2016 02:25 AM
|
显示全部楼层
本帖最后由 icy97 于 12-4-2016 03:51 AM 编辑
科技聯合獲2147萬合約
2016年4月11日
(吉隆坡11日訊)科技聯合(HTPADU,5028,主要板科技)獲為期18個月延長合約,負責維修大馬移民局應用系統,合約總值2147萬5600令吉。
科技聯合今日向馬證交所報備,公司今日收到延長合約的信函,且合約今年2月18日已生效,將于2017年8月17日到期,3年合約期滿后將視政府是否打算續約。
根據報備文件,該合約對公司淨資產並沒有帶來任何具體影響,預計可為公司未來淨利做出積極的貢獻。【中国报财经】
Type | Announcement | Subject | OTHERS | Description | EXTENSION OF THE CONTRACT AND ADDITIONAL CEILING FOR APPLICATION SYSTEM MAINTENANCE SERVICES AT THE IMMIGRATION DEPARTMENT OF MALAYSIA (JABATAN IMIGRESEN MALAYSIA (JIM)) | 1. Introduction
HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that the Company has on 11 April 2016 accepted an Extension of the Contract and Additional Ceiling for Application System Maintenance Services at the Immigration Department of Malaysia.
2. The Contract Value
The Value of the Supplementary Agreement is RM21,475,600.00 (Ringgit Malaysia Twenty One Million Four Hundred Seventy Five Thousand Six Hundred Only) (Inclusive 6% GST)
3. Duration of the Project
The Supplementary Contract is for a period of eighteen (18) months commencing from 18th February 2016 to 17th August 2017. Any further renewal or extension of the duration is at the discretion from the Government.
4. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
5. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
6. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
7. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
8. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividend policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 11 April 2016. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/5054973
|
|
|
|
|
|
|
|
发表于 21-5-2016 04:15 AM
|
显示全部楼层
科技聯合獲1820萬合約
2016年5月19日
(吉隆坡19日訊)科技聯合(HTPADU,5028,主要板科技)獲得價值1820萬令吉工程合約,為國家建築工業發展局(CIDB)設立和管理資訊系統。
該公司向馬證交所報備,將為CIDB策略管理資訊系統進行評估、製造、設計、建築、升級、數據轉移、軟件測試和認證,及系統設備和維修。
科技聯合指上述合約將在5月25日動工,估計明年3月25竣工,料積極貢獻公司未來盈利。【中国报财经】 |
|
|
|
|
|
|
|
发表于 22-5-2016 05:24 AM
|
显示全部楼层
Type | Announcement | Subject | OTHERS | Description | REVIEW, ENGINEERING, DESIGN, BUILD, INTEGRATE, DATA TRANSFER, TESTING SERVICES AND CERTIFICATION OF THE SOFTWARE, AND SYSTEM APPLICATIONS AND MAINTENANCE (WITHIN WARRANTY) OF THE STRATEGIC MANAGEMENT INFORMATION SYSTEMS FOR THE CONSTRUCTION INDUSTRY DEVELOPMENT BOARD MALAYSIA (CIDB) | 1. Introduction HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that the Company has, on 19 May 2016 accepted a Letter of Award for the Appointment of HeiTech Padu Berhad by Construction Industry Development Board Malaysia (CIDB) for the Review, Engineering, Design, Build, Integrate, Data Transfer, Testing Services and Certification of The Software, and System Applications and Maintenance (Within Warranty) of the Strategic Management Information Systems for the Construction Industry Development Board Malaysia (CIDB).
2. The Contract Value
The Contract Value of the project is RM18,200,000.00 (Ringgit Malaysia Eighteen Million Two Hundred Thousand Only) (Inclusive 6% GST).
3. Duration of the Project
The Contract is for a period of Ten (10) Months commencing from 25th May 2016 to 25th March 2017.
4. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
5. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
6. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
7. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
8. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividened policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 19 May 2016. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/5096997
|
|
|
|
|
|
|
|
发表于 30-5-2016 02:32 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
31 Mar 2016 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 31 Mar 2016 | 31 Mar 2015 | 31 Mar 2016 | 31 Mar 2015 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 85,917 | 103,320 | 85,917 | 103,320 | 2 | Profit/(loss) before tax | 1,368 | 4,702 | 1,368 | 4,702 | 3 | Profit/(loss) for the period | 1,259 | 4,410 | 1,259 | 4,410 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | 456 | 4,322 | 456 | 4,322 | 5 | Basic earnings/(loss) per share (Subunit) | 0.45 | 4.27 | 0.45 | 4.27 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 1.3000 | 1.3000 |
|
|
|
|
|
|
|
|
发表于 21-6-2016 01:35 AM
|
显示全部楼层
海德放眼2亿政府合约
2016年6月21日
(吉隆坡20日讯)海德(HTPADU,5028,主板科技股)放眼今年可从公共领域取得2亿令吉的营业额,按年增长20%。
集团副总裁兼公共领域总执行长阿里夫莫达表示,去年的营业额有60%来自公共领域,而今年估计也将保持不变。
他指出,今年可望获得3.5亿令吉的合约,首季的订单达1.8亿令吉,截至目前共投标4亿的项目。
今年表现更佳
“我们有信心达到今年目标,因为手上的一些项目已接近最后阶段,接下来就会入账。”
他预计,海德今年的表现会更佳,旗下各项计划已来到开花结果的时刻。
“虽然集团在过去几年面对许多挑战,但是我们都一一克服了,并成功在上财年转亏为盈。”
在今年首季,阿里夫莫达就看到一些正面的迹象,因获得了一些新合约,以及一些合约即将达成协议,预计可带动集团次季和第三季的营业额增长。
另外,该集团提供给我国政府的软件程式,如政府部门电子系统、防卫系统和保健系统等,吸引了印尼、缅甸、哈萨克和突尼斯等国家的青睐,有意购买和采用那些系统。
他也透露,目前海德跟印尼和缅甸各别进行合约洽谈,价值超过1.5亿令吉。【e南洋】 |
|
|
|
|
|
|
|
发表于 22-6-2016 03:23 AM
|
显示全部楼层
拟拓展银行系统服务·科技联合进军非洲东南亚
(吉隆坡21日讯)市场不确定因素萦绕,资讯科技系统及科技服务供应商科技联合(HTPADU,5028,主板科技组)认为海内外业务展望转向谨慎。
该公司总裁兼首席执行员哈里斯伊斯迈在股东大会后表示,目前策略主要是平衡业务组合,除了公共领域,也逐步拓展商业领域,如银行系统服务。
业务前景更挑战
“另外,我们也积极进军非洲、东南亚及中东市场,探讨拓展核心业务(资讯科技)至系统整合水平。”
2015财政年,公共领域贡献该公司约60%营业额。不过,对于今年是否有望维持正面业绩表现,他认为很难预测,因目前状况不似以往般容易掌握,令业务前景更显挑战。
“根据第一季业绩,预计表现将与去年类似,达到收支平衡或少许获利,展望谨慎乐观。”
该公司2013及2014财政年净亏3334万9千令吉及1042万3千令吉,2015财政年转亏为盈,取得121万1千令吉净利。
至于第一季营业额及净利按年下滑16.85%及89.45%的原因,他解释说,是受到合约延迟颁发影响。
“我们已根据未来需求投资,原本预计合约在第一季颁发,但预期中的合约并未如期而来。”
他指出,尚无法预期合约会在何时颁发,因至第二季杪,还未有预期中的合约进来。
除此之外,他说中东市场也受原油价下滑影响,一些计划已取消及延迟,仅可在油价复苏后才有望回温。
至于东南亚及非洲市场,他相信身份证管理系统(ID ManagementSolution)有很大业务潜能,因这两大市场还有12亿人口没有身份证,具有商机,但受一些国家不开放政策影响,在推广方面将面临一些挑战。
目前该公司已向印尼及缅甸政府提呈计划书,当局还在评估,他无法确定此竞标会否成功,因决定权在当地政府。
早前该公司接受《马新社》访问时透露,与印尼及缅甸政府的1亿5000万令吉合约洽谈接近尾声。
文章来源:
星洲日报/财经‧2016.06.21 |
|
|
|
|
|
|
|
发表于 22-6-2016 05:07 AM
|
显示全部楼层
Type | Announcement | Subject | OTHERS | Description | NEWS STRAITS TIMES ARTICLE DATED 20th JUNE 2016 ENTITLED "HEITECH EYES HIGHER PUBLIC REVENUE" | Reference is made to The News Straits Times article dated 20th June 2016 on page B2 entitled “HeiTech eyes higher public sector revenue”
The Company wishes to clarify that as a dynamic listed entity and in line with its corporate vision, it is constantly exploring new potential business opportunity both locally and abroad for the purpose of increasing the value of its shareholders.
As part of this, we are actively bidding for contracts worth up to RM 350 million locally and RM 150 million from abroad in total as mentioned in the said article.
As and when appropriate, HeiTech will make the requisite announcements to Bursa Malaysia Securities Berhad (“Bursa Malaysia”) should the company be successful in securing any of the contracts in line with the disclosure requirements of Bursa Securities. |
|
|
|
|
|
|
|
|
发表于 9-8-2016 02:10 AM
|
显示全部楼层
本帖最后由 icy97 于 9-8-2016 03:59 AM 编辑
海德获国能3729万合约
2016年8月9日
(吉隆坡8日讯)海德(HTPADU,5028,主板科技股)获国家能源(TENAGA,5347,主板贸易服股)颁发电流接驳站(PMU)建筑工程,总值3729万1102令吉。
根据文告,持股51%的Duta Technic私人有限公司(DTSB)于上月25日从国能手中接过该合约,负责在吉隆坡士曼丹捷运兴建132/33千伏特(kV)的电流接驳站。
该公司将负责工程设计涵盖土木和架构工程,以及高压电力设备包括制造、检验、测试、交付、安装、兴建、调试、保险和培训,以及在限定的602天内完成和投入商业运作,以在交付项目后的12个月内提供保修。
这项合约为期602天,将从8月12日开始执行,直到2018年4月5日,估计将为公司捎来盈利贡献。【e南洋】
Type | Announcement | Subject | OTHERS | Description | ACCEPTANCE OF LETTER OF AWARD FOR THE APPOINTMENT OF DUTA TECHNIC SDN BHD (SUBSIDIARY OF HEITECH PADU BERHAD) BY TENAGA NASIONAL BERHAD FOR THE ESTABLISHMENT OF PMU 132/33KV MRT SEMANTAN GIS (2X90MVA), KUALA LUMPUR | ACCEPTANCE OF LETTER OF AWARD FOR THE APPOINTMENT OF DUTA TECHNIC SDN BHD (SUBSIDIARY OF HEITECH PADU BERHAD) BY TENAGA NASIONAL BERHAD FOR THE ESTABLISHMENT OF PMU 132/33KV MRT SEMANTAN GIS (2X90MVA), KUALA LUMPUR
1. Introduction
HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that Duta Technic Sdn Bhd (“DTSB”)(a 51% owned subsidiary of HeiTech Padu Berhad) has on 25th July 2016 received a Letter of Acceptance for the Appointment of Duta Technic Sdn Bhd by Tenaga Nasional Berhad for The Establishment of PMU 132/33KV MRT Semantan (2x90MVA), Kuala Lumpur (“the Project”).
DTSB have received a consent from Tenaga Nasional Berhad on 5th August 2016 for HeiTech to release an announcement to Bursa Malaysia.
The scope of the Project is for engineering design covering civil and structural works and high voltage electrical equipment, including retrofitting works at remote end, manufacturing, inspection, testing, delivery, installation and construction, site test, commissioning, all related insurances, training, placing into commercial operation within the time for completion as stated in the contract of 602 days and remedy any defects or damage within the defects notification period of 12 month from the day of handing over of the project to TNB.
2. The Contract Value
The Contract Value of the project is RM37,291,102.84 (Ringgit Malaysia Thirty Seven Million Two Hundred Ninety One Thousand One Hunded Two And Sen Eighty Four Only)
3. Duration of the Project
The Contract is for a period of six hundred two (602) days commencing from 12th August 2016 to 5th April 2018.
4. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
5. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
6. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
7. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
8. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividened policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 8th August 2016. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/5170733
|
|
|
|
|
|
|
|
发表于 28-8-2016 04:09 AM
|
显示全部楼层
SUMMARY OF KEY FINANCIAL INFORMATION
30 Jun 2016 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 30 Jun 2016 | 30 Jun 2015 | 30 Jun 2016 | 30 Jun 2015 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 68,155 | 91,357 | 154,072 | 194,677 | 2 | Profit/(loss) before tax | -144 | 2,006 | 1,224 | 6,708 | 3 | Profit/(loss) for the period | -685 | 1,765 | 574 | 6,175 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | -680 | 1,380 | -224 | 5,702 | 5 | Basic earnings/(loss) per share (Subunit) | -0.67 | 1.36 | -0.22 | 5.63 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.02 | 0.00 | 0.02 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 1.3000 | 1.3000
|
|
|
|
|
|
|
|
|
发表于 16-9-2016 06:29 AM
|
显示全部楼层
本帖最后由 icy97 于 17-9-2016 03:43 AM 编辑
海德与Elite资本成立联营
2016年9月16日
(吉隆坡15日讯)海德(HTPADU,5028,主板科技股)宣布,与Elite资本有限公司,在百慕大成立联营公司。
根据文告,通过该联营公司,双方将探索有关软件开发、执照和维修的商机,特别是在身分识别业务、旅游业和运输业务。
其中,海德将持有49%的股权,初期缴足资本料达1万2250美元(约5万583令吉);而Elite资本则将掌握剩余的51%股权。【e南洋】
Type | Announcement | Subject | OTHERS | Description | HEITECH PADU BERHAD ("HeiTech" or 'the Company")-PROPOSED JOINT VENTURE BETWEEN HEITECH PADU BERHAD AND ELITE CAPITAL LTD | HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that the Company, had on 14th September 2016, entered into a Joint Venture Agreement (“JVA”) with Elite Capital Ltd (“ECL”) with the intention to establish and operate a joint venture company in Bermuda (“JV Company”).
(ECL and HeiTech shall collectively referred to as the “Investors” or “Parties”).
Further details on the JVA are set out in the attachment.
This announcement is dated 14 September 2016. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/5205697
|
|
|
|
|
|
|
|
发表于 11-10-2016 04:03 AM
|
显示全部楼层
本帖最后由 icy97 于 11-10-2016 04:48 AM 编辑
科技聯合獲767萬合約
2016年10月10日
(吉隆坡10日訊)科技聯合(HTPADU,5028,主要板科技)獲頒價值767萬令吉數據中心服務和緊急恢復中心合約。
科技聯合向馬證交所報備,今日收到來自國家建築工業發展局(簡稱CIDB)的工程意向書(LOA),含稅價值為767萬令吉。
根據報備文件,科技聯合相信,這項為期3年的合約,不會對2016財年的淨資產、股息政策,負債率及股本帶來重大影響。不過,該公司認為,是項合約將貢獻公司未來的盈利表現。【中国报财经】
Type | Announcement | Subject | OTHERS | Description | APPOINTMENT AND ACCEPTANCE FOR DATA CENTRE SERVICES NO. 2 AND DISASTER RECOVERY CENTRE FOR A PERIOD OF 3 YEARS FOR THE CONSTRUCTION INDUSTRY DEVELOPMENT BOARD (CIDB) | 1. Introduction
HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that the Company has on 10 October 2016 accepted a Letter of Award for the Appointment and Acceptance for Data Centre Services No. 2 and Disaster Recovery Centre for a period of 3 years for the Construction Industry Development Board (CIDB)
2. The Contract Value
The Contract Value of the project is RM7,670,160.00 (Ringgit Malaysia Seven Million Six Hundred Seventy Thousand One Hundred Sixty Only) (Inclusive 6% GST).
3. Duration of the Project
The Contract is for a period of Three (3) years. The Contract has yet to be executed.
4. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
5. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
6. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
7. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
8. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividened policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 10 October 2016. |
|
|
|
|
|
|
|
|
发表于 19-10-2016 05:18 AM
|
显示全部楼层
本帖最后由 icy97 于 20-10-2016 04:24 AM 编辑
海德获1486万订单
2016年10月19日
(吉隆坡18日讯)海德(HTPADU,5028,主板科技股)接获Prudential亚洲服务私人有限公司价值1486万2938令吉的采购订单。
海德将为Prudential亚洲服务提供灾难复苏服务(Disaster Recovery Services)和办公室租赁服务(Office Rental Services)。
根据文告,这订单不会对公司本财年的净资产造成显著影响,同时预计将贡献未来盈利。【e南洋】
Type | Announcement | Subject | OTHERS | Description | DISASTER RECOVERY SERVICES AND OFFICE RENTAL SERVICES FOR PRUDENTIAL SERVICES ASIA SDN BHD | 1. Introduction
HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that the Company has on 18 October 2016 accepted a Purchase Order from Prudential Services Asia Sdn Bhd for Disaster Recovery Services and Office Rental Services.
2. The Value and Duration
The Purchase Order value is as follow:-
No | Description | Value (RM) | Duration | 1 | Network Services – WAN Connectivity | 14,862,938.40 | 3 years |
The total value of the Purchase Order is RM14,862,938.40(Ringgit Malaysia Fourteen Million Eight Hundred and Sixty Two Thousand Nine Hundred Thirty Eight and Cent Fourty Only).
3. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
4. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
5. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
6. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
7. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividened policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 18 October 2016. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/5234385
|
|
|
|
|
|
|
|
发表于 3-11-2016 04:55 AM
|
显示全部楼层
本帖最后由 icy97 于 3-11-2016 05:50 PM 编辑
海德获陆交局7977万合约
2016年11月2日
(吉隆坡1日讯)海德(HTPADU,5028,主板科技股)宣布,获陆路交通局(JPJ)颁发合约,负责“MYSIKAP”系统的维修服务,总值7976万8327令吉。
根据文告,合约为期两年,从今年11月开始生效,直至2018年12月。任何更新或延长合约期限,将由政府酌情决定。
海德表示,上述合约将贡献每股净利。【e南洋】
Type | Announcement | Subject | OTHERS | Description | ACCEPTANCE OF LETTER OF AWARD FOR THE PROCUREMENT OF MAINTENANCE SERVICES OF MYSIKAP SYSTEM FOR THE ROAD TRANSPORT DEPARTMENT (JPJ) | 1. Introduction
HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that the Company has on 28 October 2016 received a Letter of Award for the Appointment of HeiTech Padu Berhad by Road Transport Department (JPJ) for The Maintenance Services of MYSIKAP System for the period 2016 to 2018.
The letter was signed and accepted on 1st November 2016.
2. The Contract Value
The Contract Value of the project is RM79,768,327.34 (Ringgit Malaysia Seventy Nine Million Seven Hundred Sixty Eight Thousand Three Hundred Twenty Seven and Cent Thirty Four Only) (Inclusive 6% GST).
3. Duration of the Project
The Contract is for a period of two (2) years commencing from November 2016 to Disember 2018. Any further renewal or extension of the duration is at the discretion from the Government.
4. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
5. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
6. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
7. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
8. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividened policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 1 November 2016. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/5248589
|
|
|
|
|
|
|
|
发表于 7-11-2016 01:31 AM
|
显示全部楼层
科技联合值得投资吗?
读者邓进才问:
科技联合(HTPADU,5028,主板科技组)最近有没有接到新工程合约,最新业绩及业务前景如何?值得投资吗?合理价是多少?
答:科技联合甫于今年10月10日接获建筑工业发展局(CIDB)总值767万零160令吉合约,以进行第二数据中心服务和灾难恢复中心的建设工作。相关合约为期3年,有望对集团未来盈利带来正面贡献。
截至2016年6月30日为止第二季,科技联合由盈转亏,净亏损为68万令吉(每股净亏损为0.67仙),比较前期则是净利138万令吉(每股净利为1.36仙)。第二季的营业额则下跌至6815万5000令吉,前期为9135万7000令吉。
首6个月的净亏损为224万令吉(每股净亏损0.22仙),前期净利为570万2000令吉(每股净利为5.63仙)。该公司首6个月的营业额为1亿5407万2000令吉,前期为1亿9467万7000令吉。该公司的每股资产值为1令吉30仙。
该公司在宣布最新业绩谈到业务展望时表示,公司2016年的业务环境料持续具挑战,而公司将继续推行相关策略以应付挑战,其中包括在科技工艺相关产品及服务领域方面,该公司将从现有客户攫取经常收入业务,同时从现有及新客户争取新业务。
该公司表示,将继续在中东及东盟市场开拓新的商机。至于在其大宗邮寄外包服务方面,将为公共及私人界客户群提供加值服务。
至少在过去6个月里,没有证券行进行剖析与推荐,所以没有合理价建议。
文章来源:
星洲日报‧投资致富‧投资问诊‧文:李文龙‧2016.11.06 |
|
|
|
|
|
|
|
发表于 9-11-2016 04:19 AM
|
显示全部楼层
本帖最后由 icy97 于 9-11-2016 05:45 AM 编辑
海德获颁4823万合约
整合FOMEMA 3系统
2016年11月9日
(吉隆坡8日讯)海德(HTPADU,5028,主板科技股)获颁一项合约,负责整合外劳体检系统(FWMES)、移民局出入境作业系统(myIMMs)与外劳生物特征识别系统,总值4823万令吉。
根据文告,合约内容是负责结合外劳医药检验及监控有限公司(FOMEMA)旗下的3个系统,即FWMES、myIMMs与外劳生物特征识别系统。
在FOMEMA与政府正式签署了新的专营权合约后,海德的合约届时才被视为生效。
假设政府没有在6个月内颁发合约给FOMEMA,则上述的合约将自动失效。【e南洋】
Type | Announcement | Subject | OTHERS | Description | ACCEPTANCE OF LETTER OF AWARD FOR FOMEMA'S FOREIGN WORKER MEDICAL EXAMINATION SYSTEM (FWMES) INTEGRATION WITH MYIMMS, DEPARTMENT OF IMMIGRATION MALAYSIA AND BIOMETRIC VERIFICATION OF FOREIGN WORKERS IN MALAYSIA | 1. Introduction
HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that the Company has on 2 November 2016 received a Letter of Award for FOMEMA’S Foreign Worker Medical Examination System (FWMES) Integration with MYIMMS, Department of Immigration Malaysia and Biometric Verification of Foreign Workers In Malaysia.
The Company has received a consent from FOMEMA on 8th November 2016 for HeiTech to release an announcement to Bursa Malaysia.
2. The Contract Value
The Contract Value of the project is RM48,230,000.00 (Ringgit Malaysia Forty Eight Million Two Hundred Thirty Thousand Only) (Inclusive 6% GST).
3. Duration of the Project
The Letter of Award shall be deemed to have commenced from the date of the official signing of the new Concession Agreement between FOMEMA and the Government of Malaysia.
In the event that no such award be issued by Government to FOMEMA, within six (6) months from the date of acceptance of this Letter of Award, the Letter of Award shall automatically lapse.
4. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
5. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
6. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
7. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
8. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividend policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 8 November 2016. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/5253941
|
|
|
|
|
|
|
|
发表于 21-11-2016 06:01 PM
|
显示全部楼层
本帖最后由 icy97 于 7-12-2016 06:25 AM 编辑
海德第三季净利翻3倍
2016年11月23日
http://www.enanyang.my/news/20161123/海德第三季净利翻3倍/
(吉隆坡22日讯)海德(HTPADU,5028,主板科技股)截至9月秒第三季,净利按年猛涨3.05倍至8万1000令吉,上财年同期为2万令吉。
同期营业额也猛涨87.14%至1亿5577万5000令吉,高于上财年同期的8324万2000令吉;不过,累计首9个月,净利则按年猛挫90.61%至53万7000令吉;同期营业额则按年跌13.04%,至2亿4169万2000令吉。
首9个月的资讯科技业务营业额,录得2亿1066万3000令吉,低于上财年同期的2亿5152万2000令吉。
SUMMARY OF KEY FINANCIAL INFORMATION
30 Sep 2016 |
| INDIVIDUAL PERIOD | CUMULATIVE PERIOD | CURRENT YEAR QUARTER | PRECEDING YEAR
CORRESPONDING
QUARTER | CURRENT YEAR TO DATE | PRECEDING YEAR
CORRESPONDING
PERIOD | 30 Sep 2016 | 30 Sep 2015 | 30 Sep 2016 | 30 Sep 2015 | $$'000 | $$'000 | $$'000 | $$'000 |
1 | Revenue | 155,775 | 83,242 | 241,692 | 277,919 | 2 | Profit/(loss) before tax | 535 | 286 | 1,903 | 6,993 | 3 | Profit/(loss) for the period | -44 | 210 | 1,215 | 6,384 | 4 | Profit/(loss) attributable to ordinary equity holders of the parent | 81 | 20 | 537 | 5,721 | 5 | Basic earnings/(loss) per share (Subunit) | 0.08 | 0.02 | 0.53 | 5.65 | 6 | Proposed/Declared dividend per share (Subunit) | 0.00 | 0.00 | 0.00 | 0.00 |
|
| AS AT END OF CURRENT QUARTER | AS AT PRECEDING FINANCIAL YEAR END | 7
| Net assets per share attributable to ordinary equity holders of the parent ($$) | 1.3000 | 1.3000
|
|
|
|
|
|
|
|
|
发表于 17-12-2016 06:35 AM
|
显示全部楼层
Type | Announcement | Subject | OTHERS | Description | ACCEPTANCE OF LETTER OF AWARD FOR THE APPOINTMENT OF DUTA TECHNIC SDN BHD (SUBSIDIARY OF HEITECH PADU BERHAD) BY TENAGA NASIONAL BERHAD FOR MAINHEAD B : PROPOSED 132kV SINGLE CIRCUIT LOOP IN/OUT INTO PMU TUNJUNG FROM KOTA BHARU TANAH MERAH TRANSMISSION LINE | 1. Introduction
HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that Duta Technic Sdn Bhd (“DTSB”)(a subsidiary of HeiTech Padu Berhad) has on 6th December 2016 received a Letter of Acceptance for the Appointment of Duta Technic Sdn Bhd by Tenaga Nasional Berhad for Mainhead B : Proposed 132kV Single Circuit Loop In/Out Into PMU Tunjung From Kota Bharu – Tanah Merah Transmission Line (“the Project”).
The scope of the Project is for engineering design covering civil and structural works and supply of double circuit transmission towers to facilitate looping in and out to PMU Tunjung including manufacturing, inspection, testing, delivery, installation and construction, site test, commissioning, all related insurances, placing into commercial operation within the time for completion as stated in the contract of 364 days and remedy any defects or damage within the defects notification period of 12 month from the day of handing over of the project to TNB.
Approval to release the announcement has been given by Tenaga Nasional Berhad on 16.12.2016.
2. The Contract Value
The Contract Value of the project is RM2,338,880.00 (Ringgit Malaysia Two Million Three Hundred Thirty Eight Thousand Eight Hundred And Eighty Only).
3. Duration of the Project
The Contract is for a period of Three Hundred Sixty Four (364) days from the commencement date.
4. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
5. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
6. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
7. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
8. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividend policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 16 December 2016. | http://www.bursamalaysia.com/market/listed-companies/company-announcements/5291501
|
|
|
|
|
|
|
|
发表于 17-12-2016 06:41 AM
|
显示全部楼层
本帖最后由 icy97 于 19-12-2016 05:10 AM 编辑
海德获国能921万合约
2016年12月17日
(吉隆坡16日讯)海德(HTPADU,5028,主板科技股)宣布,获国家能源(TENAGA,5347,主板贸服股)颁发两项合约,总值920万7760令吉。
海德向马交所报备,子公司Duta Technic私人有限公司,已分别在6日与7日,获得国能颁发两项合约。
其中一个是合约A:275千伏特(kV)从百万镇(Permas Jaya)双回路输入/输出至江加地不佬电流接驳站(PMU)——士古来(Skudai)输电缆,价值686万8880令吉。
而另一个是合约B:132千伏特(kV)从哥打峇鲁单回路输入/输出至Tunjung电流接驳站——丹那美拉(Tanah Merah)输电缆,价值233万8880令吉。
海德表示,合约内容是覆盖土木和结构工程的工程设计,以及提供四路电路传输塔,促进电流循环进出。
合约A为期365天,而合约B则是364天。海德相信,上述合约可贡献每股净利。【e南洋】
Type | Announcement | Subject | OTHERS | Description | ACCEPTANCE OF LETTER OF AWARD FOR THE APPOINTMENT OF DUTA TECHNIC SDN BHD (SUBSIDIARY OF HEITECH PADU BERHAD) BY TENAGA NASIONAL BERHAD FOR MAINHEAD A : PROPOSED 275kV DOUBLE CIRCUIT LOOP IN/OUT INTO PMU KANGKAR TEBRAU FROM PERMAS JAYA SKUDAI TRANSMISSION LINE | 1. Introduction
HeiTech Padu Berhad (“HeiTech” or “the Company”) is pleased to announce that Duta Technic Sdn Bhd (“DTSB”)(a subsidiary of HeiTech Padu Berhad) has on 7th December 2016 received a Letter of Acceptance for the Appointment of Duta Technic Sdn Bhd by Tenaga Nasional Berhad for Mainhead A : Proposed 275kV Double Circuit Loop In/Out Into PMU Kangkar Tebrau From Permas Jaya – Skudai Transmission Line (“the Project”).
The scope of the Project is for engineering design covering civil and structural works and supply of quadruple circuit transmission towers to facilitate looping in and out to PMU Kangkar Tebrau including manufacturing, inspection, testing, delivery, installation and construction, site test, commissioning, all related insurances, placing into commercial operation within the time for completion as stated in the contract of 365 days and remedy any defects or damage within the defects notification period of 12 month from the day of handing over of the project to TNB.
Approval to release the announcement has been given by Tenaga Nasional Berhad on 16.12.2016.
2. The Contract Value
The Contract Value of the project is RM6,868,880 (Ringgit Malaysia Six Million Eight Hundred Sixty Eight Thousand Eight Hundred And Eighty Only).
3. Duration of the Project
The Contract is for a period of Three Hundred Sixty Five (365) days from the commencement date.
4. The effect on net assets of the Group
The Proposed Transaction will not have any material effect on HeiTech Group’s Net Asset for the financial year ending 31 December 2016 and is expected to contribute positively to the future earnings of HeiTech Group.
5. The risks in relation to the contract
The risks are normal risks encountered by other Companies undertaking a similar endeavor and the Group has taken the necessary steps to protect itself and to mitigate the risks when and as it occurs.
6. Directors' and Substantial Shareholders' Interest
None of the Directors or substantial shareholders or any person connected to the Directors or substantial shareholders of HeiTech has any interest, either direct or indirect in the above Contract.
7. Statement of the Directors
The Board of Directors is of the opinion that the execution of the contract is in the ordinary course of business and is in the best interest of the Company.
8. Financial effects
The Letter of Award will have a positive effect on the earnings per share. Nevertheless, the Contract will have no material effect to the dividend policy, gearing, share capital and the substantial shareholders’ shareholdings of the Company for the financial ending 31st December 2016.
This announcement is dated 16 December 2016. |